Project: Consulting Services and Traffic Congestion Solving on Ramkhamhang – Lamsari Road
Location: Bangkok
Client: Bangkok Metropolitan Authority (BMA)
Project Value: Bath 2,000 millions
Commencement and
Completion
:
September 2008 – May 2009
Project scope :   The project consist of feasibility study and detailed design for solving traffic congestion problem on Ramkhamhang Road and Ramkhamhang – Lamsari intersection. The project have 10 - km. long along Ramkhamhang Road. consisting of 2.5 km. of 4 lane existing elevated viaduct to be renovated and improvement, 2 new 4 - lane flyovers, 2 interchanges and appox. 6 km of 6 lane at grade road. From the analysis result, the project will gain the benefit with EIRR = 12.33 % and B/C ratio = 1.03, payback period = 9 years, NPV = 63.54 Million Baht. Initial investment cost is 2937.56 million Baht.
Accomplishments :
  • Feasibility Study.

  • Preliminary Design.

  • Initial Environment Evaluation.

  • Public Participation.

  • Detailed Design



 