Koh Lanta Bridge Construction Project
Location :
Krabi province
Client :
Department of Rural Roads (DRR)
Project Value :
Bath 400 million
Commencement and Completion :
September 2010 – April 2013
Project scope :
The project aims to shorten travelling time for locals and tourists between 2 islands by constructing a bridge connecting Koh Lanta Noi and Koh Lanta Yai. The width of a bridge is 11 m for 2 traffic lanes and total length is 650 m.
Accomplishments :
- • Conducted engineering survey and carried out the detailed design of; architectural, structural, civil, electrical and mechanical system for the bridge and its associated facilities
- • Prepared construction specifications, construction contract and cost estimates.
- • Provided technical support in project management, including risk management, cost control, scheduling, monitoring and reporting;